An Aerojet Rocketdyne RS-25 rocket engine (RS-25 Engine 10001) was tested on the Fred Haise Test Stand (formerly A-1 Test Stand) at the John C. Stennis Space Center in Mississippi, on 8 June 2023, at 18:16 UTC (13:16 CDT). This was the tenth hot fire test in a planned 12-test series of the newly redesigned RS-25 engines that will be used beginning with Artemis V. The test had a planned duration of 500 seconds, the same amount of time the engines must fire during an actual flight of NASA’s Space Launch System (SLS).
Credit: NASA
#RS25
1 view
68
34
3 months ago 01:06:10 9
Test Drive Unlimited Solar Crown All Cars Sounds
4 months ago 00:05:43 1
Artemis 1 Space Launch System mission animation
5 months ago 00:00:53 1
Watch NASA Teams Move, Prep Artemis II Moon Rocket Stage for Shipment
6 months ago 00:01:00 1
Done in 60 seconds: See a Massive Rocket Fuel Tank Built in A Minute