An Aerojet Rocketdyne RS-25 rocket engine was tested on the Fred Haise Test Stand (formerly A-1 Test Stand) at the John C. Stennis Space Center in Mississippi, on 23 May 2023, at 18:48 UTC (13:48 CDT, 14:48 EDT). This was the eighth hot fire test in a planned 12-test series of the newly redesigned RS-25 engines that will be used beginning with Artemis V. The test had a planned duration of 500 seconds, the same amount of time the engines must fire during an actual flight of NASA’s Space Launch System (SLS).
Credit: NASA
#RS25
1 view
88
15
5 months ago 01:06:10 9
Test Drive Unlimited Solar Crown All Cars Sounds
7 months ago 00:05:43 1
Artemis 1 Space Launch System mission animation
7 months ago 00:00:53 1
Watch NASA Teams Move, Prep Artemis II Moon Rocket Stage for Shipment
8 months ago 00:01:00 1
Done in 60 seconds: See a Massive Rocket Fuel Tank Built in A Minute